01 · THE COMMON GAP

Integrated tests uncover incorrect addressing, loose control wiring, incomplete logic, and other basic defects.

02 · WHY IT MATTERS

Expensive system-level windows are consumed diagnosing problems that should have been removed earlier.

03 · WHAT GOOD LOOKS LIKE

Component and functional testing close basic defects before integrated scenarios begin.

04 · SUGGESTED CHANGE

Introduce a pre-IST gate covering scripts, interfaces, alarms, trends, failure modes, and open defects.

05 · FIELD TAKEAWAYIST should test integration—not compensate for incomplete commissioning.

This note describes a recurring industry pattern using combined and simplified examples. It does not represent a particular client or project.